54 m Height Floor Braced Tower Kit with STZ45G Hot-Dip Galvanized Section (Does not include restraint).

Featured Features:
- Product made under ISO 9001:2015 Regulations.
- High Elevation / Low Cost.
- 100% Assembly Inspection Section - Section.
- Hot Dip Galvanized according to NMX-H-004-SCFI-2008 .
- Ideal for high humidity coastal areas or industrial areas.
Physical Characteristics:
- Maximum Axial Load: 500 Kg.
- Height: 54 meters (18 sections).
- Wind resistance: 200 km/hr.
- Anticorrosive protection: Hot dip galvanized (NMX-H-004-SCFI-2008).
- Application: Outdoors (Wet Areas).
Includes the following components:
| Amount | Model | Description |
| 18 | STZ45G | Tower section with a face width of 45 cm. |
| 1 | SCZ45G | 45 cm tower cap with oppressor for lightning rod. |
| 1 | SBZ45G | Base for 45 cm tower. |
| 1 | SAB45G | Anchor for tower base 35/45. |
| 6 | SJB45G | Retained clamping flange. |
| 3 | SAZ45G | Floor anchor for Held. |
| 3 | SAZ60G | Floor Anchor for Paddle Type Retention |
| 36 | NECK-14-HDG | Collar for retaining cable |
| 108 | KNOT-14-FJG | 1/4" dog clamp. |
Does not include retention cable. 830 meters of 1/4" retention ( SRET-635-CAM ) or larger diameters are recommended.
Does not include Tensioners . 18 5/8" x 9" turnbuckles are recommended. ( TEN5/8X9OGJ or TEN5/8X9OQJ ).
** NOT using installation accessories such as Cable Ties, Tower base, Tower Anchor or Holding Anchors, It is considered a loss of warranty on the equipment and any additional adaptation is the responsibility of the installer.**
Complementary accessories (Not included) :
Signaling/Lighting System (Not included) :
| Amount | Model | Description |
| 3 | EIGSLSE | Autonomous LED type strobe with photocell, solar panel and battery. Type L810. |
| 3 | HLU3R2 | EIGSLSE Obstruction Lamp Assembly |
* The signage standard dictates that the tower must be painted in 7 stripes of equal size; 4 stripes in orange-reddish tone and 3 in white.
Lifeline system (Not included) :
| Amount | Model | Description |
| 1 | SHE-LV | Pair of fastening hardware |
| 3 | S-GULV | Line guide |
| 57 | SRET-338CAM | 3/8" cable |
| 6 | NUDO-38FJG | Forged knot 3/8" |
| 2 | NECK-38-HDG | 3/8" neck |
| 1 | TRY-ACC-SLIDER | (Optional) Security Cart for Installer. |
| 1 | SYS-USA7B | (Optional) Suspension Harness. |
*NOM-009 makes it mandatory to use systems that stop accidental falls into a structure.
Recommended Physical Ground System for Tower and Equipment mounted on it (Not included) :
| Amount | Model | Description |
| 1 | TG45AB | 45 A grounding electrode with Electrode, H2Ohm Filter and Compound |
| 1 | S610 | Plastic record. |
| 3 | TGCR11 | Eye Connector |
| 2 | TGAB18 | Rod Connector |
| 1 | TGBUSG10 | Junction Bar with 1000A Capacity Insulators (Without Cabinet) |
* It is recommended to use lime sheathed copper cable. 4 AWG ( SLY-287-GRN ) for electrode landing to the tower. For tower equipment, lime can be used. 6 AWG ( SLY-291-GRN ).
Recommended Basic Lightning Rod System for Tower (Not included):
| Amount | Model | Description |
| 1 | TGTDPC | Lightning Rod Tip with Aluminum Mast (MASTIL1.2) |
| 1 | TG45AB | 45 Amp electrode. With a bag of impedance improving compound (H2OHM), compass and level. |
| 1 | S610 | Small plastic register. |
| 1 | ANTIOX | Aerosol for terminal protection. |
| 3 | TGCR11 | Eye Connector. |
| 2 | TGAB18 | Rod Connector. |
| 36 | TGAC114 | Tower insulator. |
*Dipole tip offers a 72° cone of protection under the coil. It is recommended for areas with low incidence of lightning.
*2/0 gauge copper cable is recommended for integration ( SLY-346-BLK ). Considering an installation of the electrode at a maximum of 3 meters from the tower, approx. 8 meters.
*2/0 gauge copper cable is recommended for integration ( SLY-346-BLK ). Considering an installation of the electrode at a maximum of 3 meters from the tower, approx. 8 meters.
See Ground + Lightning Rod connection diagram in the following DIAGRAM .
Recommendations:
Make sure installation is done by a trained professional.Schedule a maintenance plan to check tensions in retainers and tighten hardware.
Do not install solar panels more than 6 meters high. Check compatibility between solar cells and mounts.
A stress study must be carried out when an eccentric load is placed on the tower. This can cause excessive torsion and bending in the tower causing structural failure.
The tower must be painted in a reddish-orange and white tone , in 7 stripes of equal height starting and ending in reddish-orange (SYSCOM does not carry out the painting work on the tower).
It is recommended to illuminate the tower at least at the tip with a red lamp.
Representative Diagram: Installation of Retained Version 2.0

Installation Images

